Fees
On-Site Soils performs soil evaluations for the entire state of Missouri.
Please call or fill out this form for prices in other counties not listed below.

1. St. Louis County
2. Jefferson County
3. St. Charles County
4. Lincoln County
5. Warren County
6. Franklin County
7. Ste. Genevieve County
8. St. Francois County
9. Washington County
10. Crawford County
11. Gasconade County
12. Montgomery County
13. Pike County
New Construction and/or Repairs
using backhoe soil pits.
(Fee includes backhoe provided by On-Site Soils, each fee includes 3 pits; $50 each additional pit)
$400
(if backhoe is provided by client, then $250)
Franklin County
Lincoln County
St. Charles County
Warren County
Montgomery County
Pike County
St. Louis County
Northern Crawford
Jefferson County (repair with 3 soil pits)
$450
Southern Crawford
Gasconade County
St. Francois County
(if backhoe is provided by client, then $300)
Ste. Genevieve County
Washington County
Jefferson County (new w/ soil pits)
Probe Jobs $300
St. Charles (Repairs Only)
*if unable to to probe due to gravel then $150 fee will be added to backhoe soil test fee.
Retest Fee $200
$150 w/ client backhoe
Subdivisions served by on-site sewage disposal are becoming more popular in the rural Missouri areas.
2nd Lot Discount
$50 additional lot
$25 additional /w client backhoe
Subdivisions served by on-site sewage disposal are becoming more popular in the rural Missouri areas.
Subdivision Fee Schedule
Subdivisions served by on-site sewage disposal are becoming more popular in the rural Missouri areas. The Missouri Department of Natural Resources (DNR) requires a soil suitability report for subdivisions with 7 lots or more with lot sizes under 5 acres that are to be served by on-site sewage systems.
​
We would be pleased to discuss with you any upcoming projects that would require our services. Our Subdivision Fee Schedule follows:
Geohydrologic Groundwater Evaluation Request (DNR-Rolla)
DNR (Rolla) provides this evaluation at no charge. On-Site Soils will fill out the request form and provide all required maps at no charge. To complete the request form, we will need the following:
1. Legal description of the property, or map with township, range and section.
2. Developer’s name, address and telephone
3. Type of water supply to be used (community public water, non-community public water, multi-family well or individual community public).
DNR Report (Jefferson City)
$900.00 (fixed fee)
DNR Soil Pits (one soil pit per 10 acres)
Note: Lots less than 2 acreas in size will require additional soil pits
$100.00 per soil pit evaluation
OPTIONAL: On-Site Soils can provide backhoe pits for the above evaluation for $50.00 each.
St. Charles County requires one soil pit per lot as a county requirement. Lots with DNR soil pits above do not need to be resampled.
$200.00 first soil pit evaluation. $100.00 each additional evaluation.
OPTIONAL: On-Site Soils can provide backhoe pits for the above evaluation for $50.00 each.
Franklin County requires one soil pit per lot as a county requirement for newly divided property. Plus a statement from the soil scientist indicating that the property is suitable for an on-site sewage system.
$200.00 first soil pit evaluation. $100.00 each additional evaluation.
OPTIONAL: On-Site Soils can provide backhoe pits for the above evaluation for $50.00 each.
Jefferson County requires one soil pit per lot as a county requirement for new developments with lots under 10 acreas in size in the form of a “Wastewater Report”. A wastewater report which includes our soil information must be developed by a Jefferson County approved engineering firm.
$200.00 first soil pit evaluation. $100.00 each additional evaluation.
OPTIONAL: On-Site Soils can provide backhoe pits for the above evaluation for $50.00 each.